Exhaust Muffler for exhaust catback pipe universal muffler pipe making machine
Product Parameters
Simultaneously, the inner component is pressed into the cylinder.
Vertical cap seaming machine
For the synthesis edge of the muffler cylinder and the end cover, the process of sealing the two ends of the cylinder is completed.
Horizontal cap seaming machine
For the synthesis edge of the muffler cylinder and the end cover, both ends of the cylinder cover simultaneously, each end adopts the single arm to realize the volume and pressure two kinds of capping actions, with automatic feeding and automatic feeding.
Technical Specification
Project |
Unit |
Numeric value |
Oil pressure motor power |
KW |
4 |
Rotary motor power |
KW |
3 |
High frequency machine |
|
15 |
Clamping Stroke |
mm |
0.5 |
Maximum applicable pipe |
Outer diameter * thick mm |
φ40*2.5 |
Oil pump size |
Inch |
17 |
Maximum oil pressure pressure MPa |
MPa |
12 |
Fuel tank capacity |
L |
80 (Recommended for 32 # mechanical oil and YA-N46 hydraulic oil) |
Size |
mm |
2700*850*1100 |
weight |
Kg |
900 |
Company Profile
We are a professional manufacturer of all types of metal flexible pipe making machines with more than 35 years of history. They are widely used in energy, petroleum, petrochemical, machinery, refrigeration, construction, hydropower, nuclear power, cement, paper, medicine, transportation, mining, metallurgy, urban central heating, shipbuilding, city gas, natural gas pipeline construction, Central air conditioning, aerospace, and other industries. Our machines have been exported to many countries such as Russia, Ukraine, the USA, Australia, New Zealand, Poland, Iran,etc...
Packaging & Shipping
FAQ
1. Can your machine meet our needs well?
We will give you the proposal according to your specific requirments. Every machine is customized to meet your needs well.
2. What's your payment term?
T/T by our bank account directly
3. How can we make sure about the machine quality after we put the order?
After the supplier has manufactured the equipment according to the agreed date, it shall notify the demander to the supplier for acceptance. The materials required for acceptance shall be provided by the demander. Other conditions required for acceptance, such as site, power, wiring, auxiliary materials and workers, shall be provided and arranged by the supplier. Only after the acceptance is qualified can the equipment leave the factory.
4. How about the after-sales service?
(1). The Supplier shall provide good after-sales service with a warranty period of 1 year.
(2). In case of equipment failure during the warranty period, we will call back within 4 hours after receiving the notice, and send personnel to the site to eliminate the failure within 72 hours if the phone fails to solve the problem.
Enable us make quotation for you, please kindly share information as below:
1. Technical drawing of muffler.
2. Daily production per day.
3. Configuration Requirements